Is the builder price a final quote?
No. It is a planning band based on the selected size, logo method, edge profile, and quantity. The final written quote follows the approved artwork, drawing, color target, packing, destination, and freight term.
Logo Block Spec Builder
Choose a size, logo method, edge profile, and quantity. The builder returns a planning price band and prepares the same seven inputs our factory needs for an itemized quote. Production MOQ is 100 pieces per artwork; paid samples take 3–5 days and are never credited.
These FOB Shenzhen prices are planning references for three named configurations. Freight, duties, custom packing, additional artwork versions, and changes after sample approval are separate.
| Reference specification | 100 pcs | 250 pcs | 500 pcs |
|---|---|---|---|
| 100×60×20mm clear block · full-color surface UV print · square polished edges | $12 | $9 | $7 |
| 150×80×25mm clear block · reverse UV print · beveled polished edges | $16 | $12 | $9 |
| 100×100×40mm clear block · embedded flat logo · beveled polished edges | $20 | $16 | $13 |
Published planning references, FOB Shenzhen. Final price follows the approved drawing, artwork, finish, packing, and quantity.
Interactive Builder
The result is a planning band, not a purchase quote. It updates as you change the four production decisions below.
We've received your inquiry. Our team will reply within 24 hours — usually faster.
Quote Inputs
Common Questions
No. It is a planning band based on the selected size, logo method, edge profile, and quantity. The final written quote follows the approved artwork, drawing, color target, packing, destination, and freight term.
The MOQ is 100 pieces per artwork. Separate logo versions are separate designs because each needs its own proof, print or engraving setup, and inspection reference.
Sample fees are paid separately and never credited to production. A production-grade sample normally takes 3–5 days after artwork approval.
Yes. Select the closest size and method, then attach a reference image. Vector artwork is required before the production proof is approved, but it is not required for the first planning quote.